Auto-Todo
Turn a requirement source into a durable, reviewable todolist.md. The output must be complete enough
for a human or coding agent to execute without losing scope, dependencies, verification, or important
engineering glue.
Scope Boundary
This skill owns:
- extracting required behavior, constraints, and acceptance criteria from source material
- inspecting the existing codebase when implementation context is available
- decomposing requirements into dependency-aware, verification-bounded tasks
- adding necessary integration, migration, test, observability, and lifecycle work
- writing or revising a Markdown task list with checkboxes
- validating requirement and acceptance-criterion coverage
This skill does not:
- create or redesign the product requirement unless the source is unusably ambiguous
- implement code, run the implementation, commit, deploy, or publish
- require a particular requirement format or upstream skill
- generate provider-specific cards, prompts, shell runners, or model configuration
Checkbox Contract
Every actionable task must start with a standard Markdown checkbox:
- [ ] T-001: Task title
Every independently verifiable condition under a task must also use a nested checkbox:
- Verification:
- [ ] The expected behavior is covered by an automated or explicit manual check.
Use only [ ] for open and [x] for completed. When revising an existing file, preserve completed
[x] tasks and their user notes unless the user explicitly asks to reset them.
Operating Principles
- Any requirement source is acceptable. Structured IDs are helpful but not required. Assign local source IDs when the input is free-form.
- Inspect before inventing. In an existing repository, reference current modules, schemas, routes, tests, and conventions rather than planning duplicate replacements.
- One task, one verifiable outcome. Task size is determined by behavioral and verification boundaries, not estimated human hours or a fixed number of files.
- Preserve traceability. Every task names its source requirement, and every required acceptance criterion maps to at least one task verification checkbox.
- Add only necessary glue. Include integration and cross-cutting tasks required for the requested system to work; do not add speculative infrastructure or unrelated improvements.
- Make uncertainty visible. Use explicit assumptions or blockers instead of silently inventing high-impact contracts.
- Protect secrets and user work. Never read secret-bearing files, and never discard completed checkboxes or unrelated edits in an existing task list.
Workflow
1. Resolve the Requirement Source
- Use the path, content, ticket, or specification supplied by the user.
- If the user names a project but no file, search likely documentation locations and select a unique clear match.
- If multiple materially different sources match, ask which one is authoritative.
- If no written source exists but the user supplied a sufficiently clear accepted description, use that
text and label the source
USER-BRIEF. - Reject missing or empty sources rather than fabricating a project.
Record all source paths or links at the top of the output.
2. Parse Requirements Without Requiring a Format
Extract:
- functional behavior and priorities
- acceptance criteria and examples
- non-functional constraints
- business rules, states, calculations, and data lifecycle
- explicit dependencies and external systems
- assumptions, decisions, non-goals, and open questions
If stable IDs exist, preserve them. Otherwise assign SRC-001, SRC-002, and so on for traceability.
Do not pretend inferred IDs were present in the source.
3. Inspect Existing Implementation Context
When a repository is available, inspect relevant:
- applicable
AGENTS.mdand repository documentation - manifests and test configuration
- source modules, routes, interfaces, schemas, migrations, and config examples
- current tests and established validation commands
- architecture and naming patterns
Never read .env, credentials, tokens, private keys, secret files, or unrelated personal data.
Summarize only context that changes the task plan. Existing systems should be extended rather than recreated unless replacement is an explicit requirement.
4. Build a Coverage Ledger
Before decomposition, create an internal ledger of:
- each source requirement
- each acceptance criterion
- each non-functional constraint
- each explicit non-goal
- each unresolved blocking decision
This ledger drives the final traceability table. Requirement-level coverage alone is insufficient when one requirement contains backend, frontend, migration, and operational acceptance criteria.
5. Decompose Into Verification-Bounded Tasks
Create a separate task when work has a distinct observable outcome or can fail independently. Keep work together when splitting would create artificial handoffs around one behavior.
Each task must contain:
- unique
T-xxxID and action-oriented title - source requirement IDs
- objective and behavioral boundary
- likely scope or affected areas, when known
- dependencies on other task IDs
- expected deliverables
- nested verification checkboxes
- relevant constraints, assumptions, risks, or approval needs
Do not use arbitrary 2-8 hour estimates, fixed phase sizes, or formulaic S/M/L scores. Mark risk as Low/Medium/High only when it helps execution ordering or review.
6. Add Necessary Engineering Glue
After requirement-derived tasks are drafted, check whether the requested behavior also needs:
- shared data contracts or migrations
- API, event, or frontend/backend integration
- authentication and authorization integration
- error propagation, retries, idempotency, or recovery
- configuration and secret references without exposing values
- logging, metrics, auditability, or operational readiness required by the source
- test fixtures, compatibility checks, or migration verification
- initialization, backfill, cleanup, or rollback steps
Add a glue task only when repository evidence or a source requirement makes it necessary. Mark its
source as [GLUE] and explain what requirement paths it connects.
7. Order Dependencies and Phases
- Build a directed dependency graph using task IDs.
- Reject or resolve cycles before writing the final file.
- Order tasks topologically; use product priority and risk to break ties.
- Group tasks into phases only when phases communicate meaningful execution boundaries.
- Do not impose a fixed number of tasks per phase.
- Mark tasks that can safely run in parallel, but never make one task depend on a later phase.
8. Handle Decisions and Blockers
- For low-impact reversible choices, state a conservative assumption and its evidence.
- For high-impact API, data-loss, security, compliance, migration, or public-contract choices, add a
blocker under
Open Decisionsinstead of inventing an answer. - A blocker may prevent a dependent task while the rest of the task list remains usable.
9. Write or Revise todolist.md
Use references/todolist-template.md.
- Use the user-specified output path when supplied; otherwise use
<project-root>/todolist.md. - When creating a new file, all task and verification checkboxes start unchecked.
- When updating an existing file, preserve completed
[x]state, user notes, and stable task IDs. - If a requirement was removed, do not silently delete a completed historical task; move it to a clearly labeled superseded section or ask when deletion would lose useful history.
- Do not require a separate approval merely to write the file when the user already asked to generate or revise it.
10. Validate the Output
Verify all of the following:
- every task begins with
- [ ] T-xxx:or preserved- [x] T-xxx: - every task has at least one nested verification checkbox
- task IDs are unique and dependencies reference existing IDs
- the dependency graph is acyclic
- all Must and Should requirements are covered
- every source acceptance criterion maps to a task verification checkbox
- glue tasks identify what they connect and why they are necessary
- constraints and non-goals have not been converted into contradictory tasks
- blockers and inferred assumptions are explicit
- completed checkbox state from an existing file is preserved
- the file contains no implementation code, hidden credential values, or provider-specific runner setup
Delivery Report
After writing, report:
- output path
- total, open, and completed task counts
- phase count, if phases were useful
- requirement and acceptance-criterion coverage
- glue tasks added
- blockers and assumptions
- areas that could not be verified from the available repository context
Do not start implementing the checklist unless the user separately asks for implementation.