← Back to skills
extension
Category: Development & EngineeringAPI key requirement unconfirmed

release-orchestrator

Manage the mobile release lifecycle. Produce version bumps, changelog generation, TestFlight/Internal Track submission strategies, and staged rollout plans. Focuses on release management decisions, not CI/CD pipeline setup.

personAuthor: jakexiaohubgithub

Release Orchestrator Protocol

Shipping a mobile application is not just about uploading a binary. It involves version management, clear communication through changelogs, safe testing deployment, and strategic rollout planning to mitigate the impact of unforeseen bugs.

Core principle: A release is a controlled experiment, not a single 'launch' event.


Workflow

1. Determine release type (Major, Minor, Patch, Hotfix)
2. Generate semantic version bump
3. Compile user-facing and internal changelogs
4. Define pre-production testing track (TestFlight / Play Console Internal)
5. Create a staged rollout plan for production

Step 1: Release Categorization

Analyze the changes to determine the impact:

  • Major: High impact. Large UX overhauls, core architecture changes, new monetization flows.
  • Minor: Features added but backward compatible.
  • Patch: Bug fixes, performance improvements.
  • Hotfix: Critical, out-of-band failure correction (crashes, business logic breaks).

Step 2: Version Generation

Based on semantic versioning (MAJOR.MINOR.PATCH):

  • Increment the correct segment.
  • Note any build number increment requirements for internal tracks.

Step 3: Changelogs

Create two versions from the raw commit data or feature list:

  • Internal/Developer: Technical specifics, PR numbers, API changes.
  • User-Facing (Store Notes): Benefits, not features. Accessible language. Example: Instead of "Refactored CoreData schema," say "Improved app load times so you can get to your data faster."

Step 4: Testing Tracks

Advise on the immediate next step before production:

  • iOS: TestFlight Internal vs. External testing. Usually start with 1-2 days Internal.
  • Android: Internal Testing track vs. Closed Beta vs. Open Beta.

Step 5: Rollout Strategy

Design a phased release plan based on the release impact (Step 1). A typical patch might roll out faster than a major feature change.

  • Example: Day 1 (1%), Day 2 (5%), Day 3 (20%), Day 5 (50%), Day 7 (100%).
  • State specific monitoring metrics for each phase.

Output Format

# 🚀 Release Orchestration Plan

## 📦 Version Info
- **Type:** [Major/Minor/Patch/Hotfix]
- **Previous Version:** [X.Y.Z]
- **New Version:** [A.B.C]

## 📝 Changelogs

### 📣 User-Facing (Store Update Notes)
- [Bullet point translating technical fix to user benefit]

### 🛠 Internal (For QA/Stakeholders)
- [Bullet point of technical changes]

## 🧪 Pre-Production Strategy
- **Track:** [e.g., TestFlight External Testing]
- **Duration:** [X days]
- **Focus Areas for QA/Beta Users:** [Specific areas changed]

## 📈 Staged Rollout Plan
*Halt rollout if crash-free sessions drop below [Target%]*

| Day | Percentage | Monitoring Focus |
|---|---|---|
| 1 | 1% | Fatal crashes |
| 2 | 5% | Server load |
| 4 | 20% | User feedback on new feature |
| 7 | 100% | Full availability |

When to Skip

  • The user is asking how to configure Fastlane or GitHub Actions (that is CI/CD infrastructure, not release orchestration).
  • The changes are non-production (e.g., updating a README).

Guardrails

  • Never advise a 100% Day-1 rollout unless it is a critical hotfix that resolves a store-blocking issue or 100% crash loop.
  • User-centric notes: Force user-facing changelogs away from jargon.
  • Store nuances: Remember iOS TestFlight external testing requires a basic, shorter Apple review. Plan for that delay.

References

See references/EXAMPLES.md for a worked case.


🔗 Next Steps & Handoffs

<!-- BEGIN GENERATED: handoffs (generated from the ecosystem workflow map by build_ecosystems.py — do not edit by hand) -->

Ecosystem: @ecosystem-mobile — Mobile App Domain.

Workflows:

  • Production Release Flow (mobile-release, step 2 of 3): next → @checkpoint-guardian.
  • Post-Launch Monitoring Flow (mobile-post-launch, step 3 of 3): last step → once it passes, complete the workflow and report the outcome.

Handoff contract: pass results to the next skill through an inline Handoff block in your reply with the fields skill, workflow, created_at, inputs, summary, and next (the handoff contract of @ecosystem-mobile). If a next skill is not installed, continue with its step from the ecosystem map, or install it with npx skills add fatih-developer/fth-skills --skill <name> after the user agrees.

<!-- END GENERATED: handoffs -->