<user_command>/kata:audit-milestone</user_command>
<objective> Verify milestone achieved its definition of done. Check requirements coverage, cross-phase integration, and end-to-end flows.This command IS the orchestrator. Reads existing VERIFICATION.md files (phases already verified during phase-execute), aggregates tech debt and deferred gaps, then spawns integration checker for cross-phase wiring. </objective>
<execution_context>
<!-- Spawns kata-integration-checker agent which has all audit expertise baked in --></execution_context>
<context> Version: $ARGUMENTS (optional — defaults to current milestone)Original Intent: @.planning/PROJECT.md @.planning/REQUIREMENTS.md
Planned Work: @.planning/ROADMAP.md @.planning/config.json (if exists)
Completed Work: Glob: .planning/phases//-SUMMARY.md Glob: .planning/phases//-VERIFICATION.md </context>
<process>0. Resolve Model Profile
Read model profile for agent spawning:
MODEL_PROFILE=$(cat .planning/config.json 2>/dev/null | grep -o '"model_profile"[[:space:]]*:[[:space:]]*"[^"]*"' | grep -o '"[^"]*"$' | tr -d '"' || echo "balanced")
Default to "balanced" if not set.
Model lookup table:
| Agent | quality | balanced | budget | | ------------------------ | ------- | -------- | ------ | | kata-integration-checker | sonnet | sonnet | haiku |
Store resolved model for use in Task call below.
1. Determine Milestone Scope
# Get phases in milestone
ls -d .planning/phases/*/ | sort -V
- Parse version from arguments or detect current from ROADMAP.md
- Identify all phase directories in scope
- Extract milestone definition of done from ROADMAP.md
- Extract requirements mapped to this milestone from REQUIREMENTS.md
2. Read All Phase Verifications
For each phase directory, read the VERIFICATION.md:
cat .planning/phases/01-*/*-VERIFICATION.md
cat .planning/phases/02-*/*-VERIFICATION.md
# etc.
From each VERIFICATION.md, extract:
- Status: passed | gaps_found
- Critical gaps: (if any — these are blockers)
- Non-critical gaps: tech debt, deferred items, warnings
- Anti-patterns found: TODOs, stubs, placeholders
- Requirements coverage: which requirements satisfied/blocked
If a phase is missing VERIFICATION.md, flag it as "unverified phase" — this is a blocker.
3. Spawn Integration Checker
With phase context collected:
Task(
prompt="Check cross-phase integration and E2E flows.
Phases: {phase_dirs}
Phase exports: {from SUMMARYs}
API routes: {routes created}
Verify cross-phase wiring and E2E user flows.",
subagent_type="kata-integration-checker",
model="{integration_checker_model}"
)
4. Collect Results
Combine:
- Phase-level gaps and tech debt (from step 2)
- Integration checker's report (wiring gaps, broken flows)
5. Check Requirements Coverage
For each requirement in REQUIREMENTS.md mapped to this milestone:
- Find owning phase
- Check phase verification status
- Determine: satisfied | partial | unsatisfied
6. Aggregate into v{version}-MILESTONE-AUDIT.md
Create .planning/v{version}-v{version}-MILESTONE-AUDIT.md with:
---
milestone: {version}
audited: {timestamp}
status: passed | gaps_found | tech_debt
scores:
requirements: N/M
phases: N/M
integration: N/M
flows: N/M
gaps: # Critical blockers
requirements: [...]
integration: [...]
flows: [...]
tech_debt: # Non-critical, deferred
- phase: 01-auth
items:
- "TODO: add rate limiting"
- "Warning: no password strength validation"
- phase: 03-dashboard
items:
- "Deferred: mobile responsive layout"
---
Plus full markdown report with tables for requirements, phases, integration, tech debt.
Status values:
passed— all requirements met, no critical gaps, minimal tech debtgaps_found— critical blockers existtech_debt— no blockers but accumulated deferred items need review
7. Present Results
Route by status (see <offer_next>).
<offer_next> Output this markdown directly (not as a code block). Route based on status:
If passed:
✓ Milestone {version} — Audit Passed
Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md
All requirements covered. Cross-phase integration verified. E2E flows complete.
───────────────────────────────────────────────────────────────
▶ Next Up
Complete milestone — archive and tag
/kata:complete-milestone {version}
<sub>/clear first → fresh context window</sub>
───────────────────────────────────────────────────────────────
If gaps_found:
⚠ Milestone {version} — Gaps Found
Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md
Unsatisfied Requirements
{For each unsatisfied requirement:}
- {REQ-ID}: {description} (Phase {X})
- {reason}
Cross-Phase Issues
{For each integration gap:}
- {from} → {to}: {issue}
Broken Flows
{For each flow gap:}
- {flow name}: breaks at {step}
───────────────────────────────────────────────────────────────
▶ Next Up
Plan gap closure — create phases to complete milestone
/kata:plan-milestone-gaps
<sub>/clear first → fresh context window</sub>
───────────────────────────────────────────────────────────────
Also available:
- cat .planning/v{version}-MILESTONE-AUDIT.md — see full report
- /kata:complete-milestone {version} — proceed anyway (accept tech debt)
───────────────────────────────────────────────────────────────
If tech_debt (no blockers but accumulated debt):
⚡ Milestone {version} — Tech Debt Review
Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md
All requirements met. No critical blockers. Accumulated tech debt needs review.
Tech Debt by Phase
{For each phase with debt:} Phase {X}: {name}
- {item 1}
- {item 2}
Total: {N} items across {M} phases
───────────────────────────────────────────────────────────────
▶ Options
A. Complete milestone — accept debt, track in backlog
/kata:complete-milestone {version}
B. Plan cleanup phase — address debt before completing
/kata:plan-milestone-gaps
<sub>/clear first → fresh context window</sub>
─────────────────────────────────────────────────────────────── </offer_next>
<success_criteria>
- [ ] Milestone scope identified
- [ ] All phase VERIFICATION.md files read
- [ ] Tech debt and deferred gaps aggregated
- [ ] Integration checker spawned for cross-phase wiring
- [ ] v{version}-MILESTONE-AUDIT.md created
- [ ] Results presented with actionable next steps </success_criteria>
微信扫一扫