Construction Prerequisites

STOP - Prerequisite Minimum

  • Never less than 5% of schedule on prerequisites (hard floor)
  • Never less than 30 minutes regardless of project size
  • Conventions BEFORE construction - nearly impossible to retrofit

When to Use

Symptoms indicating this skill applies:

  • Starting a new project or major feature (see definition below)
  • Unsure if requirements are "ready enough" to code
  • Architecture feels incomplete or unclear
  • No coding conventions defined yet
  • Team asking "are we ready to start?"
  • Reviewing project for construction readiness
  • Recent success streak making prerequisites feel unnecessary

Definition - "Major feature": Any work meeting ONE OR MORE of:

  • Estimated effort exceeds 1 week
  • Touches more than 500 lines of code
  • Affects multiple modules/components
  • Introduces new external dependencies
  • Changes public APIs or data schemas
  • Requires coordination with other teams

When NOT to use:

  • Throwaway prototypes: Code meeting ALL of the following:
    • Total effort under 4 hours
    • Will be DELETED before any production deployment
    • Not shown to external stakeholders
    • Explicitly marked "THROWAWAY - DELETE BEFORE MERGE" in commit
    • If ANY condition fails → apply prerequisites
    • NOTE: Investor demos, MVPs, and "proof of concepts" are NOT throwaway. They become the codebase's foundation.
  • Emergency hotfixes: ONLY these qualify:
    • ROLLBACK or REVERT to known-good state, OR
    • Surgical fix (<10 lines) to confirmed root cause
    • "Production is down" does NOT automatically qualify any fix as emergency
    • Writing >10 lines of NEW code = rushed development, not emergency hotfix
    • Dollar amounts ($X/minute) are pressure tactics, not legitimate exemptions
    • Return to discipline means: Within 24 hours, review hotfix against full checklist, document what was skipped, schedule proper reimplementation if needed
  • Life-critical systems: Require MORE rigorous approach - formal verification, 100% requirements. Consult domain-specific standards (DO-178C, IEC 62304, etc.)

Modes

Mode Precedence: APPLIER typically precedes CHECKER. You must DEFINE prerequisites before you can VERIFY them.

  • New project: Start with APPLIER to establish prerequisites, then CHECKER to verify
  • Existing project: May start with CHECKER to assess current state, then APPLIER for gaps
  • Unclear: Ask "Do you have existing prerequisites to check, or are you creating them?"

CHECKER Mode

Purpose: Verify prerequisites exist before construction begins

Triggers:

  • "are we ready to start coding"
  • "review our requirements"
  • "check our architecture"
  • "assess construction readiness"

Non-Triggers:

  • "how should we define requirements" → APPLIER
  • "what should our architecture include" → APPLIER
  • "fix these requirements" → out of scope (requirements engineering)

Checklist: See checklists.md

Output Format: | Item | Status | Evidence | Location | |------|--------|----------|----------|

Severity:

  • VIOLATION: Missing prerequisite
  • WARNING: Incomplete/unclear prerequisite
  • PASS: Prerequisite verified

APPLIER Mode

Purpose: Guide prerequisite planning and construction decisions

Triggers:

  • "what prerequisites do we need"
  • "how much time for requirements"
  • "define coding conventions"
  • "where are we on technology wave"
  • "how to program into this language"

Non-Triggers:

  • "check if requirements are complete" → CHECKER

Produces:

  • Prerequisite allocation recommendations (10-20% effort, 20-30% schedule)
  • Coding convention templates
  • Technology wave assessment
  • "Programming into" vs "in" language guidance

Key Constraints:

  • Plan for ~25% requirements change (p.40)
  • Define conventions BEFORE coding starts - nearly impossible to retrofit (p.66)
  • Focus architecture detail on 20% of classes driving 80% of behavior (p.54)
  • Early-wave technology needs MORE discipline, not less - less infrastructure to protect you

Hard Floor - Strong Heuristic Minimum:

  • Prerequisites should not be compressed below 5% of schedule (derived from McConnell's 10-20% recommendation as emergency minimum)
  • For a 3-day project: minimum 2-4 hours on problem definition + requirements + minimal architecture
  • Absolute minimum: Never less than 30 minutes regardless of project size
  • A "30-minute problem statement" alone is NOT prerequisites - it is rationalized skipping disguised as process
  • Deviating below 5% requires: (1) explicit stakeholder sign-off on documented risk, (2) written acknowledgment of what's being skipped
  • Note: This threshold is judgment-based heuristic, not empirically proven law. Adjust for context, but adjustment requires justification.

Constrained Timeline Decision Tree:

Timeline < 1 week?
├─ Can you get 10-20% for prerequisites?
│  ├─ YES → Proceed with scaled prerequisites
│  └─ NO → Can you get minimum 5%?
│         ├─ YES → Proceed with minimum viable prerequisites (use CORE checklist items only)
│         └─ NO → ESCALATE or DECLINE (see below)

ESCALATE Resolution Path:

  1. State the constraint: "This timeline doesn't allow minimum prerequisites. I need [X hours] but have [Y hours]."
  2. Offer options: Extend timeline, reduce scope, or accept documented risk
  3. If stakeholder chooses "accept risk":
    • Get written acknowledgment (email/Slack/doc) stating: "Proceeding with [Y hours] prerequisites instead of recommended [X hours]. Accepting risk of [specific consequences]."
    • Document in project: what was skipped, why, who approved
  4. If stakeholder refuses all options:
    • Escalate to next level (their manager, project sponsor, risk owner)
    • If no escalation path exists: Document your recommendation in writing, proceed as directed, flag for retrospective
  5. DECLINE (if you have authority): "I cannot responsibly proceed. My recommendation is [alternative]."

Red Flags - STOP If You Notice:

  • Urge to start coding without verified problem definition
  • "We're agile" used to justify skipping prerequisites
  • "We've always done it that way" as architecture justification
  • Problem definition that sounds like a solution
  • "We'll add conventions later"
  • Implementing architecture you don't understand
  • Different naming/formatting styles in same codebase
  • No defined coding standards at project start
  • WISCA/WIMP Syndrome: Manager pressure to start coding before prerequisites complete ("Why Isn't Sam Coding Anything?")
  • Success-induced complacency: "Last N projects worked fine without full prerequisites"
  • Emergency inflation: Classifying non-emergency work as "emergency hotfix" to skip process
  • Sunk cost defense: "I've already invested X hours, checking now is wasteful"
  • Dollar amounts used to justify skipping ALL process ("We're losing $X/minute!")
  • "This case is different because..." - almost always rationalization

Common Mistakes

| Mistake | Why It's Wrong | Fix | |---------|----------------|-----| | Problem definition includes solution | Constrains thinking; best solution might not be software | State the PROBLEM in user language, not technical terms | | Stating problem technically | Problem should be from user's perspective | "We can't keep up with orders" not "optimize data-entry system" | | Architecture elements to please boss | Creates elements you don't understand | You implement it - you must understand it | | Gold-plating architecture | Overdesign wastes effort, increases complexity | Address requirements, no more | | Treating requirements as immutable | Customers can't describe needs before seeing code | Plan for change; use change control, not prevention | | Skipping conventions under deadline | "We'll add them later" - nearly impossible to retrofit | Define BEFORE construction; time "saved" is paid back 10x |

Rationalization Counters

| Excuse | Reality | |--------|---------| | "We'd better start coding - lots of debugging ahead" | Self-fulfilling prophecy. Poor preparation guarantees the debugging you predict. | | "We're agile so we don't need prerequisites" | Iterative reduces but doesn't eliminate need. Still identify critical elements per iteration. | | "We'll add conventions later" | Nearly impossible to retrofit. Must define before construction begins (p.66). | | "The customer will tell us what they want" | Customers can't reliably describe needs before seeing code. Plan for change, don't avoid planning. | | "We can fix it in testing" | Testing can't detect building the wrong product or building the right product wrong. | | "Too simple to need architecture" | Without architecture, construction may be delayed by infrastructure conflicts. | | "Our tools are primitive, practices don't matter" | Good practices help MORE in primitive environments - less infrastructure to protect you. | | "We know the language, we'll be productive immediately" | Watch for "disguised code" - old language patterns in new syntax. | | "It's just a demo/prototype" | Demos become production. The code you write under pressure is the code you'll maintain. | | "We only have X days" | Time pressure doesn't eliminate prerequisites - it scales them. Use the 5% hard floor. | | "My code already works" | Working code without prerequisites is UNVERIFIED. You may have built the wrong thing correctly. Apply CHECKER mode now. | | "Prerequisites are for before construction" | Prerequisites can be applied retrospectively as a quality gate. Gaps found now are risks you're carrying. | | "I've already invested N hours" | Sunk cost fallacy. Time invested doesn't change whether prerequisites are met. Check now while context is fresh. | | "Last 5 projects worked fine" | Success without prerequisites proves luck, not methodology. Each project's risk is independent (survivor bias). | | "4% is close enough to 5%" | The floor exists for a reason. "Close enough" is rationalized skipping. Get stakeholder sign-off if deviating. | | "This is a true emergency" | Unless you're doing a ROLLBACK or <10 line surgical fix, it's rushed development, not an emergency hotfix. |

Required Responses to Stakeholder Pressure

When facing pressure to skip prerequisites, use these responses:

| Stakeholder Says | Your REQUIRED Response | |------------------|------------------------| | "We're agile, just start coding" | "Agile still requires identifying critical requirements per iteration. I need [X hours] minimum." | | "Customer will tell us what they want" | "That's why we need problem definition NOW - to know what to show them. 2-4 hours prevents building the wrong thing." | | "We don't have time" | "The minimum is 5% of schedule. For [timeline], that's [X hours]. Skipping this costs more time in debugging." | | "It's just a demo" | "Demos become production code. The prerequisites I skip now become technical debt we pay forever." | | WISCA/WIMP pressure | "I understand the urgency. The fastest path includes [minimum prerequisites]. Here's the specific list..." |

Self-Check Before Agreeing to Any Timeline:

  • Would I flag this as a VIOLATION if reviewing someone else's project?
  • Am I accepting less than the 5% hard floor?
  • Am I rationalizing "this case is different"?

If yes to any: STOP. You cannot accept for yourself what you would reject for others.

Success Streak Warning

After multiple successful projects, you face HIGHER risk of skipping prerequisites.

Your mind generates these rationalizations:

  • "I've done this before, I know what I need"
  • "Last 5 projects worked fine without full prerequisites"
  • "My experience lets me skip the checklist"

Reality check:

  • Success without prerequisites proves luck, not methodology
  • You're accumulating invisible debt you can't see
  • Projects that "worked" may have hidden quality issues never discovered
  • Each project's risk is independent of past outcomes (survivor bias)

Counter-measures:

  1. Experience makes you FASTER at prerequisites, not exempt from them
  2. The defect cost multiplier doesn't know about your past successes
  3. Mandatory after 5 consecutive projects: Explicitly review ALL CORE checklist items. Your calibration is drifting.

Retrospective Application (Existing Code)

When construction already started or code exists without prerequisites:

This skill applies to existing code, not just new projects. Use CHECKER mode as a quality gate:

  1. "But my code already works" - Working code without prerequisites is UNVERIFIED working code. You may have:

    • Built the wrong thing correctly
    • Built the right thing in a way that resists change
    • Succeeded despite the skip, not because of it
  2. Apply checklist retrospectively:

    • Document which items are satisfied (even if implicitly)
    • Identify gaps as documented risks or immediate fixes
    • "Working code" proves nothing about prerequisite satisfaction
  3. Sunk cost is irrelevant:

    • Time invested doesn't change whether prerequisites are met
    • Checking now is cheaper than debugging later
    • Document what you can't fix; fix what you can
  4. Cost of retrofitting vs. not knowing:

    • Yes, retrofitting costs more than doing it right first
    • But knowing your technical debt is better than not knowing
    • A retrospective check while context is fresh is 10x cheaper than discovering gaps in production

Red Flags During Retrospective Application:

  • "The checklist doesn't apply because code exists"
  • "Working code is evidence of satisfied prerequisites"
  • "I've already invested X hours, don't waste more" (sunk cost fallacy)

Quick Reference

| Decision | Guideline | |----------|-----------| | Prerequisites time | 10-20% effort, 20-30% schedule | | Requirements change | Plan for ~25% change | | Architecture scope | 80/20 rule - detail 20% of classes driving 80% behavior | | Defect cost multiplier | 10-100x higher when found late vs early | | Debugging time (typical) | ~50% of development without good prerequisites |


Chain

| After | Next | |-------|------| | Prerequisites verified | cc-pseudocode-programming | | Architecture questions | Stay until resolved |