返回 Skill 列表
extension
分类: 营销与增长无需 API Key

consulting-strategy-development

内部咨询子技能,用于战略项目管理和建议开发辅导(B3模块)。当检测到B3信号时,由咨询剧本调度器激活 - 项目风险、建议质量、市场推广、定价、团队问题。请勿直接调用;使用咨询剧本作为入口点。

person作者: jakexiaohubgithub

Context Intake From Dispatcher

Receive and restate:

  • Situation
  • Stage
  • Time pressure
  • Matched module (B3 A or B3 B)
  • Confidence and routing reason

Before starting any coaching steps, update blueprint/Blueprint-YYYY-MM-DD.md:

  • Fill **Module:** with the matched B3 module name.
  • Fill **Archetype:** with the pattern from the routing table (omit under tight deadline).
  • Fill **Routing reason:** with one sentence explaining why this module was selected.
  • Fill **Signal confidence:** with High / Medium / Low.
  • Fill **Time pressure:** with the user's stated constraint.
  • Fill ## 1. Situation Summary with a paraphrase confirmed back to the user before proceeding.

SOP Reference Files

Before coaching, load the relevant reference file:

  • B3 A (project management, activity planning): read references/b3a-project-management.md
  • B3 B (recommendations, GTM, pricing): read references/b3b-recommendations.md

These files contain exact SOP techniques (3-metric lead-time prioritization, 8-step task de-black-box, skill-will matrix, 5-upgrade recommendation checklist, move-the-needle math with cannibalization, STP→4Ps sequence, 4-part robust recommendations framework). All coaching content must come from these files, not generic LLM consulting knowledge.

B3 A: Managing Strategy Projects

Core method

  • Prioritize by lead time and dependency risk, not deadline alone.
  • De-black-box vague tasks into executable sub-steps with owners.
  • Use IT/data request discipline with early sample-pull hedge.
  • Build and pressure-test activity plan: granularity, critical path, staffing, milestone realism.
  • Manage communication and buy-in as a parallel workstream.
  • Run strong client launch discipline to reduce skepticism and friction.
  • Handle tornado moments through scope-time-resource option framing.
  • Manage team performance with skill-will diagnosis and de-risked delegation.

B3 A coaching checklist

  1. Identify long-lead, low-control dependencies.
  2. Decompose hidden sub-tasks and bottlenecks.
  3. Lock calendars and data request samples early.
  4. Build one-page activity plan with milestones/owners.
  5. Pressure-test critical path and staffing fit.
  6. Map buy-in stakeholders and pre-wire risk points.
  7. Define tornado response options.
  8. Set delegation checkpoints and buffer deadlines.

B3 B: Developing High-Impact Recommendations

Core method

  • Build GTM logic in sequence: STP before 4Ps.
  • Choose segments using appeal, size/growth, targetability, adoption timing.
  • Design product strategy by feasible x appealing fit and adoption sequence.
  • Treat timing debates as option problems when downside asymmetry is high.
  • Use recommendation critique checklist: specificity, impact math, risk/mitigation, implementation realism.
  • Quantify move-the-needle impact and include cannibalization.
  • Synthesize competitors with 80/20 value proposition logic.
  • Fuse quant + qual to uncover hidden drivers.
  • Ensure brand-consistent strategic choice.
  • Design pricing tiers with explicit cost-to-serve analysis.
  • Capture bonus insights as appendix-level opportunities.
  • Use interim recommendation pack when decisions are needed with partial information.

B3 B coaching checklist

  1. Define decision and segment priority.
  2. Build STP then 4Ps logic chain.
  3. Quantify net impact with explicit assumptions.
  4. Evaluate risks and mitigation plan.
  5. Specify implementation path, owners, and milestones.
  6. Check brand alignment and organizational fit.
  7. Surface missing analyses that could change recommendation.

Pattern-Adaptive Delivery

Match delivery style to routed archetype.

Diagnostic Tree mode

  • Use branching logic for trade-offs, risk forks, and failure modes.

Linear Process mode

  • Use sequential flow from diagnosis to implementation roadmap.

Heuristic mode

  • Use concise decision rules for speed, skepticism control, and executive communication.

Adaptive Depth by Time Pressure

  • tight deadline: give full action checklist immediately, with minimal viable quantification and risk controls.
  • moderate timeline: stepwise coaching with milestone checks.
  • exploratory: deep coaching with alternatives, options framing, and rationale.

Pattern Trigger

If user says explain pattern or why this approach?, state:

  • Active archetype
  • Why it fits current strategic signal
  • Why alternatives are secondary now

Report Mode: Strategy/Recommendation Deck Blueprint

Use when dispatcher flags deliverable-building behavior.

Stage 0: SCQA skeleton

Create strategy deck skeleton with:

  • Situation
  • Complication
  • Question
  • Answer
  • Strategic options
  • Recommendation
  • Risk mitigation
  • Implementation roadmap
  • Financial impact

Stage 1: Section blueprint

For requested section, provide:

  • Argument structure
  • Required evidence and calculations
  • Skeptic questions to pre-answer

Stage 2: Skeptic-proof quality gate

Pass only if:

  • Recommendation is specific and quantified
  • Alternatives were considered
  • Risks and mitigations are explicit
  • Implementation is realistic
  • Brand/organizational fit is clear

Consulting Blueprint Section Mapping (B3)

Always keep all 8 sections.

  • 1. Situation Summary: strategic objective, timeline, constraints, stakeholder dynamics.
  • 2. Framework / Approach Selected: B3 A or B3 B plus pattern.
  • 3. Decision Logic: rationale, assumptions, confidence level, option logic.
  • 4. Step-by-Step Playbook: project-control or recommendation-build sequence.
  • 5. Evidence Required: dependency checks, market evidence, impact assumptions, cost inputs.
  • 6. Quality Gates: critical path integrity, skeptic-proof test, risk controls, implementation viability.
  • 7. Missing Gaps: unresolved data, untested assumptions, dependency uncertainty.
  • 8. Next Action: immediate owner/action/checkpoint to maintain momentum.