JIRA Story Point Estimator

通过分析复杂性、范围,并与历史团队数据进行比较,为JIRA工单估算故事点。当用户请求估算、打点或确定工单规模,或者询问“这个应该是多少点?”时激活。

person作者: jakexiaohubgithub

JIRA Story Point Estimator Skill

When to Use This Skill

Activate this skill when the user:

  • Asks "estimate this ticket" or "how many story points?"
  • Asks to "size" or "point" a ticket
  • Asks "what should this be pointed at?"
  • Wants help with sprint planning estimation
  • Asks "is X points right for this ticket?"
  • Reviews a ticket that needs story points

Story Point Scale Reference

HyperFleet uses a modified Fibonacci sequence for story points:

| Points | Meaning | Typical Scope | Notes | |--------|---------|---------------|-------| | 0 | Tracking Only | Quick/easy task with stakeholder value | Rarely used. For tasks worth tracking but with negligible effort compared to a 1-pointer | | 1 | Trivial | One-line change, extremely simple task | The smallest issue possible - everything scales from here. No risk, very low effort, very low complexity | | 3 | Straightforward | Time consuming but fairly straightforward work | Doesn't have to be complex, but usually time consuming. Minor risks possible | | 5 | Medium | Requires investigation, design, collaboration | Probably needs discussion with others. Can be quite time consuming or complex. Risks involved | | 8 | Large | Big task requiring investigation and design | Requires collaboration with others. Solution can be quite challenging. Risks are expected. Design doc required | | 13 | Too Large | Should be split into smaller stories | Ideally, this shouldn't be used. If you see an issue this big, it must be broken down |

Estimation Methodology

Step 1: Fetch Ticket Details

jira issue view TICKET-KEY --plain 2>/dev/null

Step 2: Analyze Complexity Factors

Scope Indicators (examine description and acceptance criteria):

  • Number of acceptance criteria
  • Number of components/files likely affected
  • Integration points mentioned
  • Testing requirements

Complexity Indicators:

  • New feature vs. modification vs. bug fix
  • Requires new patterns or unfamiliar technology
  • External dependencies (APIs, services)
  • Database/schema changes
  • Security implications
  • Documentation requirements

Risk Indicators:

  • Ambiguity in requirements
  • Dependencies on other tickets
  • Time-sensitive (blocks other work)
  • Requires coordination with other teams

Step 3: Find Similar Historical Tickets

Search for comparable completed tickets:

jira issue list -q"project = HYPERFLEET AND status = Done AND type = Story" --plain 2>/dev/null | head -20
jira issue list -q"project = HYPERFLEET AND status = Done AND 'Story Points' is not EMPTY AND type = Story" --plain 2>/dev/null | head -20

Step 4: Provide Estimation

Output Format

Estimation for: TICKET-KEY

Summary: [Ticket title] Type: [Story/Task/Bug]


Complexity Analysis

| Factor | Assessment | Impact | |--------|------------|--------| | Scope | [Small/Medium/Large] | [Description] | | Technical Complexity | [Low/Medium/High] | [Why] | | Dependencies | [None/Few/Many] | [List if any] | | Testing Effort | [Minimal/Moderate/Extensive] | [Why] | | Risk/Uncertainty | [Low/Medium/High] | [Why] |


Recommendation

Suggested Story Points: X

Confidence Level: [High/Medium/Low]

Reasoning:

  • [Primary factor 1]
  • [Primary factor 2]
  • [Comparison to similar work]

Similar Completed Tickets (for reference)

| Ticket | Summary | Points | Similarity | |--------|---------|--------|------------| | TICKET-A | [Summary] | 5 | High - similar scope | | TICKET-B | [Summary] | 3 | Medium - simpler version |


Considerations

  • If higher: [What would make this larger]
  • If lower: [What would make this smaller]
  • Break-down suggestion: [If 13+ points, suggest how to split]

Setting Story Points

Once agreed, set story points using:

jira issue edit TICKET-KEY --custom story-points=X --no-input

Or for Story Point Estimate field (Next-gen projects):

jira issue edit TICKET-KEY --custom story-point-estimate=X --no-input

Team Calibration Notes

When estimating, consider:

  • Team's typical velocity (points completed per sprint)
  • Recent similar work and how long it actually took
  • Team familiarity with the codebase area
  • Current sprint load and focus

Anti-Patterns to Flag

  • Anchoring: Don't let existing (wrong) estimates bias you
  • Scope Creep: Point what's written, not what might be added
  • Hero Estimates: Assume average team member, not expert
  • Planning Fallacy: Add buffer for unknowns
  • Story Point Inflation: Keep consistent with team baseline