Pre-Plan Workflow — Definition Floor
When entering plan mode, use the MCP to set the definition floor before writing your plan.
The definition floor is the baseline of existing work, documentation requirements, and gate constraints that the plan must account for.
If MCP is unreachable: Proceed with planning based on conversation context. Note in the plan that MCP state could not be verified — existing work may overlap. Re-check after MCP reconnects.
Step 1: Check Existing MCP State
Resolve the scope first from the SessionStart context. A ## Project Scope section carries a project rootId (scopes reads and anchors); a ## Personal Scope section carries a personal root (anchors only; reads stay unscoped). Without session context, read .taskorchestrator/config.yaml's top-level project.rootId (a file read, not an MCP call), which yields a project rootId only.
Call the health check to see what's already tracked:
get_context()
When a project rootId is known, pass it to scope the check to this project: get_context(ancestorId="<rootId>"). In personal scope, or when no rootId is known, call unscoped exactly as shown — this is the same behavior as before project scoping existed.
If active or stalled items exist:
- Identify items related to the current request — avoid planning work that duplicates what's already tracked
- For each relevant active item, call
get_context(itemId=...)to inspect:- Note schema — which notes are expected for this item's tags
- Gate status — which required notes are filled vs. missing, and whether the item can advance
- Guidance key —
guidanceKeynames the first unfilled required note; resolve its authoring guidance viaquery_items(operation="schema", itemId=...)
If no items exist (clean slate):
- The definition floor is simply "no existing MCP state to account for"
- Proceed with planning, but still check Step 2 for schema awareness
Step 2: Discover Note Schema Requirements
Read the file named by the session context's Config: line when there is one, otherwise .taskorchestrator/config.yaml in the project root (this is a file read, not an MCP call):
- If the file exists, list the discovered schemas and their required notes per phase
- Schemas are defined under
work_item_schemas:(preferred) ornote_schemas:(legacy) - Each schema key (e.g.,
feature-implementation,bug-fix) is a type identifier — set it as the item'stypefield to activate gate enforcement. Tags can be used for additional categorization but are no longer the primary schema activator. - Required queue-phase notes define what documentation must exist before work starts
- Required work-phase notes define what must be captured during implementation
- Use
guidanceKeyfromget_context(itemId=...), resolved viaquery_items(operation="schema", itemId=...), to understand how to author each note
If no config file exists, the project has no note schemas — items will be schema-free with no gate enforcement. Proceed with planning normally.
Minimal config example:
work_item_schemas:
feature-task:
notes:
- key: task-scope
role: queue
required: true
- key: implementation-notes
role: work
required: true
Use schemas to inform the plan: When a schema applies, each planned task should:
- Note which schema type will be applied at materialization (e.g.,
type: "feature-task") - Account for required notes — plan sections should naturally produce content that maps to required note keys
- Respect dependency ordering — which tasks block others (these become
BLOCKSedges)
Step 3: Plan with MCP Awareness
Structure the plan knowing it will be materialized into MCP items after approval:
- Each planned task should map to one work item with clear boundaries — a single unit of work a subagent can own
- Account for dependency ordering — which tasks block others (these become
BLOCKSedges) - Consider the hierarchy — a root container item with child task items is the standard pattern
Continue with Plan Mode
The prerequisite is complete. Now proceed with plan mode's normal workflow — explore the codebase, understand existing patterns, and design your implementation approach. Use the definition floor from Steps 1-3 to inform your plan.
Once the plan is approved, the post-plan hook will guide you through materialization and implementation dispatch. Do not materialize before approval.
微信扫一扫